A multi-million-dollar redevelopment of Hawke’s Bay Airport’s terminal is nearing completion.
The project involved a heavily staged program to extend the existing footprint to both the north and the south of its current location. The expansion has increased the size of the terminal from 2,500m2 to 4,340m2 and is designed to support the sustainable growth of aeronautical connectivity to and from the region.
The suffered it’s fair share of adversity, with the liquidation of original Main Contractor Arrow International, and the Global Covid-19 Pandemic decimating the travel and tourism industry. The project, however has triumphed through this adversity, to provide an Airport the region can be proud of.