The residential development at 1205–1209 Beatty Place and 1017–1031 Hood Street, Mayfair, Hastings, was a major housing project delivered by PGC Constructors for Kāinga Ora. The Scope of Works included site preparation, civil infrastructure, and the construction of 24 new dwellings to meet diverse housing needs—remarkably, all construction completed within just 12 months.
The project was delivered in three stages. SP1 comprised 7 units constructed on individual slabs. This was followed by SP2, which added 6 units across 4 slabs. The final phase, SP3, completed the remaining units, bringing the total to 24. The entire development was handed over and fully tenanted in July 2025. Each stage was executed with a strong emphasis on quality and close collaboration with stakeholders.
As one of the largest projects PGC has delivered for Kāinga Ora, the development is a standout achievement and a valuable addition to the community. The high construction standards make it a model of modern urban residential development, enhancing the neighbourhood and supporting local housing needs.